Finding Faults Early

It is commonly believed that the earlier a defect is found the cheaper it is to fix it. The following table shows the cost of fixing the defect depending on the stage it was found. For example, if a problem in the requirements is found only post-release, then it would cost 10–100 times more to fix than if it had already been found by the requirements review.

Cost to fix a defect Time detected
Requirements Architecture Construction System test Post-release
Time introduced Requirements 5-10× 10× 10-100×
Architecture 10× 15× 25-100×
Construction 10× 10-25×