Table of Content
TPM Basics
- Quality and Relevance
- TQM
- Lean Basics
- Lean Value and Techniques
- 5S
- TPM Basics
- TPM Principles
TPM Pillar 1 - Jishu Hozen (Autonomous Maintenance)
- What is Jishu Hozen?
- Goals of Jishu Hozen
- Autonomous Maintenance Effects
- Operator Skill Levels
- Initial Clean
- Manager’s Model and Pilot Teams
- Visual Controls
- Activity boards
- The One Point Lesson (OPL)
TPM Pillar 2 - Kobetsu Kaizen or Continuous Improvement
- What is Kobetsu Kaizen?
- Equipment Losses
- Causal Factor Relationships
TPM Pillar 3 - Planned Maintenance
- What is Planned Maintenance?
- Time-Based Maintenance
- Usage-Based Maintenance
- Condition-Based Maintenance
- Predictive Maintenance
- Closed-Loop Automation
- Corrective Maintenance
- Effective PM
- Reliability Centered Maintenance
TPM Pillar 4 - Hinshitsu Hozen or Quality Maintenance (QM)
- Quality Maintenance Basics
- Quality Maintenance Principles
- Quality Maintenance Analysis Tools
- Quality Maintenance Stages
- QM Aims
- The Figure-of-Eight Method for Quality Maintenance
TPM Pillar 5 - Materials Planning, Design and Equipment Control
- Maintenance Prevention
- Early Equipment Management
TPM Pillar 6 - Education & Training
- Need for Training and Development
- Skills
- Phases of Skills
- Skill Evaluation
TPM Pillar 7 - Office TPM Pillar
- Administrative TPM
- P Q C D S M and Office TPM
- Implementing office TPM
TPM Pillar 8 - Safety, Health and Environment
- Safety, Health & Environment Basics
- Why-Why Analysis
- Industrial Accident Phases
- Environmental Safety
- A Case Study
Preventive and Predictive Maintenance
- Preventive Maintenance:
- Designing a Preventive Maintenance Program
- Preventive Maintenance Tools
- Predictive Maintenance
- Predictive Maintenance Technologies
- Predictive Maintenance Working
- Data preparation for predictive maintenance
- Modeling Techniques for Predictive Maintenance
- Training, validation, and testing methods for predictive maintenance
Equipment Failures
- Age-related failure mode
- Non-age-related failure mode
- Failure Analysis Tools
- Five Whys
- Ishikawa/Fishbone Diagram
- Cause-and-Effect Analysis/Causal Factor Tree
- Failure Modes and Effects Analysis
- Fault or Logic Tree Analysis
- Barrier Analysis
- Change Analysis/Kepner-Tregoe
- Statistical Tools
- Data Analytics
Overall Equipment Effectiveness (OEE)
- What is OEE (Overall Equipment Effectiveness)?
- OEEE Example
- The Six Big Losses
- SMED
Implementing TPM
- Impediments
- TPM Implementation Phases
Spare Parts Management
- What is Spares parts management?
- Spares Parts Inventory Analysis
Team Management
- Team Building
- Team Communication
- Team Socializing
- Team Culture
- Team Motivation
Change Management
- Overview of Change Management
- Recognizing Obstacles to Change
- Introducing Change
- Managing Change
- Eight-Step Change Management Process
- Strategies for Effective Implementation of Change
- Leading Change
- The CHANGE Model
- Leading through Change
Apply for certification
https://www.vskills.in/certification/quality/total-productive-maintenance-certification